Project Photos

Our Lady of the Elms Athletic Complex

Master Planning, Site Design, Engineering and
Landscape Architecture

Project Overview

Project Overview

EG&G, Inc. was engaged by Our Lady of the Elms High School to provide master planning, site design, engineering, and construction administration services for development of a 23 acre outdoor sports complex located in Bath, Ohio. Directing a team that included architectural, geotechnical, and electrical subconsultants, EG&G, Inc. designed a broad range of sports facilities and site improvements including a 400 meter track with bleachers, soccer fields, tennis courts, softball fields, access drives, paved parking areas, restrooms and multi-use pavilions. Built on a portion of the Ecology Center, the complex is designed to be a model of sensitive development utilizing porous pavement to reduce stormwater runoff; composting restrooms to reduce water usage, and preserving much of the sites existing native fields and wooded areas. EG&G, Inc. was also responsible for obtaining development approval from Bath Township, Summit County, EPA, and ODOT as well as securing approval from the companies holding oil and gas rights.

Financing

Community Response

"Before" Photos